LALI- BANGESTAN Oil Field Development Project
Location: Khuzestan Province
Client:National Iranian South Oil Co.
Client:Jahanpars(EPC Contr.)
Contract Type:Detail Design, Procurement Services, Field Engineering
Completion Date:2025
Scope of Work:Optimization of the separation system in the Lali SPU unit and construction of an 8-inch oil pipeline (22 km) from Lali SPU to the new Lali plant.
Construction of a 12-inch oil pipeline (112 km) from the new Lali plant to Maroun-1 production unit.
Inspection and repair of two existing pipelines (each 120 km long).
Client camp and facilities.
Subsurface work including wellhead facilities, related flow lines (28 km), and wastewater pipeline (35 km).