30” Subsea Gas Pipeline from Salman platform to Siri Island
Location: Persian Gulf, Iran
Client:Iranian Offshore Oil Co. (IOOC).
Client:Jahanpars (EPC Contr.)
Contract Type:Detail Design, Procurement Services, Field Engineering
Progress: 82.5%
Scope of Work:
Detail engineering of ~147 km 30” multiphase pipeline running parallel to the existing one
Associated risers and tie-in spools
Pre-engineering, safety, pre-construction and pre-installation studies
Full engineering services: FEED, detailed design, procurement documentation, construction engineering, installation engineering, and all related documents
Procurement, inspection, transportation, customs clearance, delivery, and preservation of materials and equipment
Fabrication, load-out, sea fastening, transportation, installation, tie-in, testing, pre-commissioning, commissioning, startup, and performance testing of the pipeline