What We Do

Conceptual Study
Petrogas Jahan provid provides conceptual studies that evaluate technical options prepare preliminary process design, estimate costs and define project requirement.

Basic Design Engineering
In this stage, we translate the project concept into a clear engineering basis. Our team prepares process flow diagrams (PFDs), utility requirements, material balances, and preliminary equipment sizing, along with safety and environmental considerations.
This provides the foundation for Detailed Design and ensures that all project stakeholders share a common technical understanding before execution.

Front-End Engineering Design (FEED)
FEED defines the technical scope of a project before moving into detailed design. Our team prepares confirmed P&IDs, equipment datasheets, plot plans, and accurate cost estimates.
This phase reduces risks, improves budget reliability, and ensures a smooth transition to EPC execution

Detailed Design Engineering
At this stage, our team transforms the basic design into full construction-ready documents. We deliver detailed P&IDs, equipment specifications, civil/structural drawings, electrical and instrumentation layouts, and 3D plant models.
The outcome is a complete package of Approved for Construction (AFC) documents and procurement deliverables, ensuring a seamless transition to the EPC execution phase.

Procurement Engineering Services
Our procurement engineering team ensures that every piece of equipment and material meets the project’s technical, quality, and schedule requirements. We provide complete support from vendor selection to final delivery.

Field Engineering, Supervision & Management Control
Our field engineering team provides continuous support during construction, ensuring that all site activities comply with design intent, technical standards, and HSE requirements.
Petrogas Timeline

Azar Oil Field Central Process Facilities
- 2014
- Name: Azar Oil Field Central Process Facilities (CPF)
- Project Duration: 2014 – Present
- Engineering Duration: 2014 – Present
- Owner: Petroleum Engineering and Development Company (PEDEC)
- Client: Sarvak Azar Engineering and Development Company (SAED)

Pazanan Oil Field Gas Lift Project
- 2010
- Name: Pazanan Oil Field Gas Lift Project
- Project Duration: 2010 – 2014
- Engineering Duration: 2010 – 2014
- Owner: National Iranian South Oil Company (NISOC)
- Engineering Contractor: PetroGas Jahan Engineering Company

Bid Boland II Gas Refinery
- 2015
- Name: Bid Boland II Gas Refinery
- Project Duration: 2015 – Present
- Engineering Duration: 2015 – Present
- Owner: National Iranian Gas Company (NIGC)
- Client: Persian Gulf Petrochemicals Industry Company (PGPIC)

Sepahan Base Oil Unit
- 2019
- Name: Sepahan Base Oil Unit
- Project Duration: 2019 – Present
- Engineering Duration: 2019 – Present
- Owner: Sepahan Oil Company (SOC)
- MC: Namavaran Delvar Engineering & Construction (NDEC)

Bushehr Utility & Offsite
- 2019
- Name: Bushehr Utility & Offsite
- Project Duration: 2019 – Present
- Engineering Duration: 2019 – Present
- Owner: Bushehr Petrochemical Company (BUPC)
- MC: Samto Soo Tose’e Iranian (SSTI) & Namavaran Delvar (NDEC)

Yadavaran Central Treatment Export Plant (CTEP)
- 2011
- Name: Yadavaran Central Treatment Export Plant (CTEP)
- Project Duration: 2011 – 2017
- Engineering Duration: 2011 – 2017
- Owner: Petroleum Engineering and Development Company (PEDEC)
- Engineering Contractor: China Petroleum and Chemical Corporation (SINOPEC)