What We Do
Supply Chain Managment
Procurement is a critical function during Execution and generally it is considered as the largest block of a typical EPC project. It covers all aspects of sourcing and purchase of every item of goods or services necessary for completion of the work.
Construction & Fabrication
Construction of the facilities is normally the longest phase of the project schedule, with the highest complexity, interaction and interfaces among a wide range of participants. Besides the fact JAHANPARS owns several fully equipped logistic bases in different…
Project Managment Service
Managing an EPC contract is often complicated and requires special expertise and knowledge. Our project management teams are established early on in a contract to control the whole process from design, through assembly, to start-up. We feature a sound management…
Engineering & Design
Engineering stage is generally the most significant stage (in terms of man hours) of project execution. In JAHANPARS Group, all engineering activities are being done by PETROGAS JAHAN Engineering Co. as engineering arm of the group, either as a stand-alone…
Front-End Planning
Petrogas utilizes a project management system based on stage-gate approach. A stage-gate methodology is a gated framework which involves dividing project life cycle into distinct phases, where each gate acts as a checkpoint prior to proceeding to the next phase.
Industries & Mine
Jahanpars has developed solid capabilities and experience in mining and metals industry through strategic cooperation with international partners. Clients come to us with diverse scopes of work for EPC services.
Find out moreInfrastraucture
Infrastructure projects focus on the development and maintenance of services, facilities, and systems. Our Infrastructure Portfolio has a good understanding of and experience in different contracting models including…
Find out morePetrochemical & Chemical
The petrochemical and chemical industry play an important role in manufacturing innovative, life-enhancing products and technologies as an integral part of the global economic development. Jahanpars group in collaboration with pioneer technology …
Power & Renewable Energy
Power and Renewable energy projects range from thermal, hydroelectric, solar, wind, hydro, wave, tidal, geothermal and nuclear production. The growing electricity generation along with energy consumption demand…
Oil & Gas
On account of the growing population and power consumption per capita, energy consumption is increasing day by day. Jahanpars group as an integrated EPC contractor in the country and Middle East offers a wide range of professional services…
Petrogas Timeline
Azar Oil Field Central Process Facilities
- 2014
- Name: Azar Oil Field Central Process Facilities (CPF)
- Project Duration: 2014 – Present
- Engineering Duration: 2014 – Present
- Owner: Petroleum Engineering and Development Company (PEDEC)
- Client: Sarvak Azar Engineering and Development Company (SAED)
Pazanan Oil Field Gas Lift Project
- 2010
- Name: Pazanan Oil Field Gas Lift Project
- Project Duration: 2010 – 2014
- Engineering Duration: 2010 – 2014
- Owner: National Iranian South Oil Company (NISOC)
- Engineering Contractor: PetroGas Jahan Engineering Company
Bid Boland II Gas Refinery
- 2015
- Name: Bid Boland II Gas Refinery
- Project Duration: 2015 – Present
- Engineering Duration: 2015 – Present
- Owner: National Iranian Gas Company (NIGC)
- Client: Persian Gulf Petrochemicals Industry Company (PGPIC)
Sepahan Base Oil Unit
- 2019
- Name: Sepahan Base Oil Unit
- Project Duration: 2019 – Present
- Engineering Duration: 2019 – Present
- Owner: Sepahan Oil Company (SOC)
- MC: Namavaran Delvar Engineering & Construction (NDEC)
Bushehr Utility & Offsite
- 2019
- Name: Bushehr Utility & Offsite
- Project Duration: 2019 – Present
- Engineering Duration: 2019 – Present
- Owner: Bushehr Petrochemical Company (BUPC)
- MC: Samto Soo Tose’e Iranian (SSTI) & Namavaran Delvar (NDEC)
Yadavaran Central Treatment Export Plant (CTEP)
- 2011
- Name: Yadavaran Central Treatment Export Plant (CTEP)
- Project Duration: 2011 – 2017
- Engineering Duration: 2011 – 2017
- Owner: Petroleum Engineering and Development Company (PEDEC)
- Engineering Contractor: China Petroleum and Chemical Corporation (SINOPEC)